Skip to main content
Orion Five Engineering

10 Jalan Kilang #04-05, Singapore 159410
+65 6100 5505

Resources · Tool

Integration Readiness Assessment

Fifteen questions across the five dimensions that decide whether an integration survives contact with a working site. It scores each one separately and will not let four strong dimensions carry a fatal fifth — because that combination is the exact shape of the projects that fail.

Five precision-machined steel gauge blocks standing in a row, four aligned at the same height and the fifth shorter and set out of line, a red witness line running across their faces and breaking where the short block interrupts it.
Takes
6 minutes
You get
A scored readiness profile and the two weakest dimensions named
Cost
Free, no sign-up

Everything below runs in your browser. Nothing you enter is sent to us, stored, or logged, and closing the tab discards it. There is no submit button and no server call — the result below updates as you answer.

Equipment accessibility

UNIT 01

Whether the physical asset can be read and commanded, by someone other than the company that installed it.

What can the equipment you want to integrate actually talk to today?

Take the least accessible asset in scope, not the newest one. The project is paced by the worst case, not the average.

If a third party needed access to that equipment, could you grant it?

This is a commercial question more often than a technical one.

What documentation exists for the installed system?

Data foundation

UNIT 02

Whether there is anything trustworthy to integrate, and whether a thing on the floor can be matched to a row in a system.

Can a physical thing be matched to a record in a system, reliably?

Asset tags, batch numbers, container numbers, work orders — whatever your unit of work is.

How much operating history could you hand over tomorrow?

Relevant if anything downstream is going to learn from patterns rather than follow rules.

When the numbers in the system disagree with the floor, which is right?

Everyone has an answer to this. It is the most diagnostic question in the model.

Network and security posture

UNIT 03

What gets exposed the moment the operational side and the business side are joined.

How is the control network separated from the office network?
How do outside parties get in when equipment needs support?

Machine builders, integrators and maintenance contractors all count.

Who owns security for the operational side?

Process stability

UNIT 04

Whether the process being automated is settled enough to be worth encoding.

How settled is the process you want to automate?
What share of cases go down the exception path?

Exceptions are where automation projects lose their business case. Estimate honestly rather than optimistically.

Can the decision the process turns on be written down as a rule?

Operating capacity

UNIT 05

Who runs the thing on the Monday after handover, and what happens when it breaks.

Who owns this system after handover?

Not who sponsors the project — who is accountable for it still working in eighteen months.

How does your organisation take on a new system?
Is there budget for running it, separate from building it?

Licences, support, the hours somebody spends on it each month, and the first year's changes.

0 of 15 answered — the result appears when the last one is in

Result

UNIT 06

ANSWER ALL 15 QUESTIONS TO SEE YOUR PROFILE

Technical references

UNIT 07

What the reasoning on this page is drawn from. Where a standard costs money to read it is marked, and where a free document covers the same ground better it is listed first.

Links open in a new tab so anything you have entered above survives. Every one was checked at build time; if one has rotted since, tell us and it comes out rather than getting patched from memory.

Every one of these tools is a compressed version of a conversation. If yours turned up something you would rather talk through than read about, that is what the scoping call is for — bring your result with you.

Talk through your binding constraint

Also on the shelf